Power Supply and Generation Data for 03-Feb-2009
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3465 |
2576 |
2394 |
8435 |
19.30 |
|
Min. Demand catered in MW |
3249 |
2066 |
2198 |
7513 |
4.00 |
|
Energy Catered In MUs. |
82.410 |
60.316 |
47.210 |
189.936 |
|
|
|
Central Sector + Bilateral (SCH) |
53.109 |
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
3.520 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.03 |
48.81 |
49.35 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
7.336 |
9.064 |
22.078 |
9.726 |
48.204 |
UGVCL |
3.704 |
2.618 |
27.169 |
9.158 |
42.649 |
MGVCL |
2.874 |
5.781 |
3.149 |
7.941 |
19.745 |
DGVCL |
4.025 |
5.698 |
2.063 |
16.844 |
28.630 |
TOTAL |
17.939 |
23.161 |
54.459 |
43.669 |
139.228 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
82.305 mus |
|
B |
DAILY PLF |
81.28 % |
|
C |
DAILY PAF |
86.16 % |
|
D |
CUMMULATIVE PLF |
74.24 % |
|
E |
CUMMULATIVE PAF |
81.17 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
78.90 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
82.27 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.13 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
3233 |
-407 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2081 |
-407 |
9574 |
|
Planned Outage |
240 |
0 |
0 |
|
|
|
|
Force Outage |
345 |
60 |
160 |
|
|
|
|
Available |
72 |
480 |
0 |
|
|
|
|
Rest Outage |
233 |
2 |
-135 |
|
|
|
|
Gen/Flow at 7hrs. |
3329 |
5 |
2702 |
1910 |
-407 |
7946 |