Power Supply and Generation Data for 04-Feb-2009
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3354 |
2745 |
2444 |
8543 |
19.30 |
|
Min. Demand catered in MW |
3329 |
2399 |
1748 |
7476 |
4.00 |
|
Energy Catered In MUs. |
80.276 |
63.207 |
45.123 |
188.606 |
|
|
|
Central Sector + Bilateral (SCH) |
50.847 |
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
4.963 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.00 |
48.77 |
49.25 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
7.172 |
9.326 |
21.359 |
10.999 |
48.856 |
UGVCL |
3.648 |
2.513 |
26.993 |
8.453 |
41.607 |
MGVCL |
2.804 |
5.813 |
3.177 |
8.057 |
19.851 |
DGVCL |
4.029 |
5.593 |
2.070 |
16.534 |
28.226 |
TOTAL |
17.653 |
23.245 |
53.599 |
44.043 |
138.540 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
80.171 mus |
|
B |
DAILY PLF |
79.18 % |
|
C |
DAILY PAF |
85.66 % |
|
D |
CUMMULATIVE PLF |
74.26 % |
|
E |
CUMMULATIVE PAF |
81.17 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
79.14 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
79.62 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.15 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
3233 |
-721 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
1764 |
-721 |
9257 |
|
Planned Outage |
240 |
0 |
0 |
|
|
|
|
Force Outage |
345 |
60 |
160 |
|
|
|
|
Available |
0 |
480 |
0 |
|
|
|
|
Rest Outage |
295 |
2 |
-85 |
|
|
|
|
Gen/Flow at 7hrs. |
3339 |
5 |
2652 |
1772 |
-721 |
7768 |