Power Supply and Generation Data for 05-Feb-2009
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3413 |
2942 |
2289 |
8644 |
20.00 |
|
Min. Demand catered in MW |
3329 |
2328 |
1917 |
7574 |
5.00 |
|
Energy Catered In MUs. |
80.221 |
64.948 |
46.722 |
191.891 |
|
|
|
Central Sector + Bilateral (SCH) |
46.979 |
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
8.655 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.03 |
48.81 |
49.35 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
7.291 |
9.549 |
21.597 |
11.088 |
49.525 |
UGVCL |
3.755 |
2.670 |
27.050 |
9.189 |
42.664 |
MGVCL |
2.777 |
5.806 |
3.260 |
7.987 |
19.830 |
DGVCL |
4.133 |
5.657 |
2.089 |
16.721 |
28.600 |
TOTAL |
17.956 |
23.682 |
53.996 |
44.985 |
140.619 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
80.117 mus |
|
B |
DAILY PLF |
79.12 % |
|
C |
DAILY PAF |
85.66 % |
|
D |
CUMMULATIVE PLF |
74.27 % |
|
E |
CUMMULATIVE PAF |
81.18 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
76.30 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
79.58 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.16 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
3233 |
-721 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
1759 |
-721 |
9252 |
|
Planned Outage |
240 |
0 |
0 |
|
|
|
|
Force Outage |
554 |
60 |
160 |
|
|
|
|
Available |
68 |
480 |
0 |
|
|
|
|
Rest Outage |
138 |
2 |
-405 |
|
|
|
|
Gen/Flow at 7hrs. |
3219 |
5 |
2972 |
1992 |
-721 |
8188 |