Power Supply and Generation Data for 05-Feb-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

        

1. Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered in MW

3413

2942

2289

8644

20.00

Min. Demand catered in MW    

3329

2328

1917

7574

5.00

Energy Catered    In MUs.

80.221

64.948

46.722

191.891

 

Central Sector + Bilateral (SCH)

           46.979

 

2. BILATERAL TRANSACATION DATA IN Mus:

Bilateral Sale   

8.655

Bilateral Purchase

0.000


 

3. FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.03

48.81

49.35

 

4. DISCOM WISE ENERGY IN Mus.

    DISCOM

        JGY

     URB/TWN

      AGR

        IND

      TOTAL

PGVCL

7.291

9.549

21.597

11.088

49.525

UGVCL

3.755

2.670

27.050

9.189

42.664

MGVCL

2.777

5.806

3.260

7.987

19.830

DGVCL

4.133

5.657

2.089

16.721

28.600

TOTAL 

17.956

23.682

53.996

44.985

140.619

 

5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

80.117 mus

B

DAILY PLF

  79.12 %

C

DAILY PAF

  85.66 %

D

CUMMULATIVE PLF

  74.27 %

E

CUMMULATIVE PAF

  81.18 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  76.30 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

  79.58 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

  75.16 %

 

 6. Generation available in MW at 07.00 Hours                

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4219

547

2727

3233

-721

10417

Capacity Available

4219

547

2727

1759

-721

9252

Planned Outage

240

0

0

 

 

 

Force Outage

554

60

160

 

 

 

Available

68

480

  0

 

 

 

Rest Outage

138

2

-405

 

 

 

Gen/Flow at 7hrs.

3219

5

2972

1992

-721

8188