Power Supply and Generation Data for 08-Feb-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

 

                       

1.    Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

3235

2681

2196

8112

19.30

Min. Demand catered   in  MW

3094

2577

1650

7321

4.00

Energy Catered   in Mus.

77.185

62.656

45.479

185.320

Schedule Share

Central Sector + Bilateral

46.056

 

 

 

 

2.  BILATERAL TRANSACTION DATA IN Mus :

Bilateral Sale   

8.933

Bilateral Purchase

0.000

 

3.   FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.35

48.99

49.54

     

      4. DISCOM-WISE ENERGY IN MUs

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

7.639

9.389

21.256

11.290

49.574

UGVCL

3.752

2.523

26.126

9.283

41.684

MGVCL

2.833

5.578

3.096

7.544

19.051

DGVCL

4.200

5.436

1.980

16.067

27.683

TOTAL

18.424

22.926

52.458

44.184

137.992

       5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  76.406 mus

B

DAILY PLF

  75.46 %

C

DAILY PAF

  80.63 %

D

CUMULATIVE PLF

  74.31 %

E

CUMULATIVE PAF

  81.18 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  80.66 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

  76.92 %

H

CUMULATIVE PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS...

  75.20 %

          6. Generation available in MW at 07.00 Hours                

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4219

547

2727

3233

-386

10417

Capacity Available

4219

547

2727

1941

-386

9434

Planned Outage

240

0

0

 

 

 

Force Outage

304

60

296

 

 

 

Available  

68

480

  0

 

 

 

Restricted Outage

204

2

-304

 

 

 

Gen. / Flow 7hrs.

3403

5

2735

1869

-386

8012

 

3653

81

2412

2169

16

8315