Power Supply and Generation Data for 09-Feb-2009
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3543 |
2410 |
2522 |
8475 |
19.30 |
|
Min. Demand catered in MW |
3149 |
2258 |
2074 |
7481 |
4.00 |
|
Energy Catered in Mus. |
81.126 |
60.646 |
47.753 |
189.525 |
|
|
Schedule Share |
Central Sector + Bilateral |
48.190 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACTION DATA IN Mus :
|
Bilateral Sale |
4.512 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.17 |
48.84 |
49.48 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
7.450 |
9.750 |
21.562 |
11.843 |
50.605 |
|
UGVCL |
3.627 |
2.459 |
25.980 |
8.551 |
40.617 |
|
MGVCL |
2.864 |
5.736 |
3.405 |
7.586 |
19.591 |
|
DGVCL |
4.072 |
5.561 |
1.986 |
16.438 |
28.057 |
|
TOTAL |
18.013 |
23.506 |
52.933 |
44.418 |
138.870 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
80.340 mus |
|
B |
DAILY PLF |
79.34 % |
|
C |
DAILY PAF |
85.49 % |
|
D |
CUMULATIVE PLF |
74.33 % |
|
E |
CUMULATIVE PAF |
81.18 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
84.83 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS... |
79.94 % |
|
H |
CUMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.22 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
3233 |
-290 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2034 |
-290 |
9527 |
|
Planned Outage |
240 |
0 |
0 |
|
|
|
|
Force Outage |
224 |
60 |
218 |
|
|
|
|
Available |
0 |
480 |
0 |
|
|
|
|
Restricted Outage |
176 |
2 |
-97 |
|
|
|
|
Gen. / Flow 7hrs. |
3579 |
5 |
2606 |
1866 |
-290 |
8056 |
|
|
3653 |
81 |
2412 |
2169 |
16 |
8315 |