Power Supply and Generation Data for 09-Feb-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

                       

1.  Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

3543

2410

2522

8475

19.30

Min. Demand catered   in  MW

3149

2258

2074

7481

4.00

Energy Catered   in Mus.

81.126

60.646

47.753

189.525

Schedule Share

Central Sector + Bilateral

48.190

 

 

 

 

2.  BILATERAL TRANSACTION DATA IN Mus :

Bilateral Sale   

4.512

Bilateral Purchase

0.000

 

3.  FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.17

48.84

49.48

     4. DISCOM-WISE ENERGY IN MUs

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

7.450

9.750

21.562

11.843

50.605

UGVCL

3.627

2.459

25.980

8.551

40.617

MGVCL

2.864

5.736

3.405

7.586

19.591

DGVCL

4.072

5.561

1.986

16.438

28.057

TOTAL

18.013

23.506

52.933

44.418

138.870

      5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  80.340 mus

B

DAILY PLF

  79.34 %

C

DAILY PAF

  85.49 %

D

CUMULATIVE PLF

  74.33 %

E

CUMULATIVE PAF

  81.18 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  84.83 %

G

DAILY PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS...

  79.94 %

H

CUMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

  75.22 %

        6. Generation available in MW at 07.00 Hours                 

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4219

547

2727

3233

-290

10417

Capacity Available

4219

547

2727

2034

-290

9527

Planned Outage

240

0

0

 

 

 

Force Outage

224

60

218

 

 

 

Available  

0

480

  0

 

 

 

Restricted Outage

176

2

-97

 

 

 

Gen. / Flow 7hrs.

3579

5

2606

1866

-290

8056

 

3653

81

2412

2169

16

8315