Power Supply and Generation Data for 10-Feb-2009
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3669 |
2258 |
2635 |
8562 |
20.00 |
|
Min. Demand catered in MW |
3365 |
2145 |
2140 |
7650 |
5.00 |
|
Energy Catered In MUs. |
84.758 |
56.569 |
50.031 |
191.358 |
|
|
|
Central Sector + Bilateral (SCH) |
49.165 |
|||
2. BILATERAL TRANSACTION DATA IN Mus :
|
Bilateral Sale |
5.105 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.49 |
48.99 |
49.75 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
| PGVCL |
7.337 |
9.095 |
21.196 |
10.824 |
48.452 |
| UGVCL |
3.787 |
2.627 |
26.061 |
9.370 |
41.845 |
| MGVCL |
2.866 |
5.740 |
3.396 |
7.602 |
19.604 |
| DGVCL |
4.049 |
5.778 |
2.040 |
17.078 |
28.945 |
| TOTAL |
18.039 |
23.240 |
52.693 |
44.874 |
138.846 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
83.979 mus |
|
B |
DAILY PLF |
82.94 % |
|
C |
DAILY PAF |
88.50 % |
|
D |
CUMMULATIVE PLF |
74.36 % |
|
E |
CUMMULATIVE PAF |
81.19 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
76.06 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
83.71 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.24 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
3233 |
-506 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
1978 |
-506 |
9471 |
|
Planned Outage |
240 |
0 |
0 |
|
|
|
|
Force Outage |
464 |
60 |
400 |
|
|
|
|
Available |
72 |
405 |
218 |
|
|
|
|
Rest Outage |
234 |
-2 |
65 |
|
|
|
|
Gen/Flow at 7hrs. |
3209 |
84 |
2044 |
2535 |
-506 |
7872 |