Power Supply and Generation Data for 10-Feb-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

                       

1.  Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered in MW

3669

2258

2635

8562

20.00

Min. Demand catered in MW 

3365

2145

2140

7650

5.00

Energy Catered In MUs.

84.758

56.569

50.031

191.358

 

Central Sector + Bilateral (SCH)

49.165

 

2.  BILATERAL TRANSACTION DATA IN Mus :

Bilateral Sale   

5.105

Bilateral Purchase

0.000

 

3.  FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.49

48.99

49.75

     4. DISCOM-WISE ENERGY IN MUs

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

7.337

9.095

21.196

10.824

48.452

UGVCL

3.787

2.627

26.061

9.370

41.845

MGVCL

2.866

5.740

3.396

7.602

19.604

DGVCL

4.049

5.778

2.040

17.078

28.945

TOTAL 

18.039

23.240

52.693

44.874

138.846

      5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

83.979 mus

B

DAILY PLF

  82.94 %

C

DAILY PAF

  88.50 %

D

CUMMULATIVE PLF

  74.36 %

E

CUMMULATIVE PAF

  81.19 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  76.06 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

  83.71 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

  75.24 %

        6. Generation available in MW at 07.00 Hours                 

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4219

547

2727

3233

-506

10417

Capacity Available

4219

547

2727

1978

-506

9471

Planned Outage

240

0

0

 

 

 

Force Outage

464

60

400

 

 

 

Available

72

405

  218

 

 

 

Rest Outage

234

-2

 65

 

 

 

Gen/Flow at 7hrs.

3209

84

2044

2535

-506

7872