Power Supply and Generation Data for 11-Feb-2009
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3313 |
2528 |
2435 |
8276 |
20.00 |
|
Min. Demand catered in MW |
2757 |
1783 |
2915 |
7455 |
4.00 |
|
Energy Catered In MUs |
76.470 |
52.344 |
58.569 |
187.383 |
|
|
|
Central Sector + Bilateral (SCH) |
52.606 |
|||
2. BILATERAL TRANSACTION DATA IN Mus :
|
Bilateral Sale |
3.827 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.72 |
49.02 |
49.76 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
| PGVCL |
7.271 |
9.306 |
20.895 |
11.578 |
49.050 |
| UGVCL |
3.653 |
2.563 |
26.193 |
8.402 |
40.811 |
| MGVCL |
2.898 |
5.756 |
3.398 |
7.605 |
19.657 |
| DGVCL |
3.951 |
5.590 |
1.952 |
16.525 |
28.018 |
| TOTAL |
17.773 |
23.215 |
52.438 |
44.110 |
137.536 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
75.406 mus |
|
B |
DAILY PLF |
74.47 % |
|
C |
DAILY PAF |
87.63 % |
|
D |
CUMMULATIVE PLF |
74.36 % |
|
E |
CUMMULATIVE PAF |
81.19 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
77.86 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
77.44 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.25 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
3233 |
-322 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2164 |
-322 |
9657 |
|
Planned Outage |
240 |
0 |
0 |
|
|
|
|
Force Outage |
464 |
60 |
160 |
|
|
|
|
Available |
0 |
480 |
0 |
|
|
|
|
Rest Outage |
230 |
-77 |
116 |
|
|
|
|
Gen/Flow at 7hrs. |
3285 |
84 |
2451 |
2203 |
-322 |
8023 |