Power Supply and Generation Data for 28-Feb-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3418 |
2676 |
2845 |
8939 |
15.00 |
|
Min. Demand catered in MW |
3388 |
2638 |
2237 |
8263 |
4.00 |
|
Energy Catered In MUs. |
84.204 |
64.100 |
56.316 |
204.620 |
|
|
|
Central Sector + Bilateral (SCH) |
49.569 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
7.500 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.16 |
48.83 |
49.37 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.552 |
11.505 |
20.317 |
12.060 |
52.434 |
|
UGVCL |
4.368 |
3.118 |
25.309 |
9.531 |
42.326 |
|
MGVCL |
3.288 |
6.055 |
3.287 |
8.049 |
20.679 |
|
DGVCL |
4.443 |
5.787 |
2.067 |
17.107 |
29.404 |
|
TOTAL |
20.651 |
26.465 |
50.980 |
46.747 |
144.843 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
82.290% |
|
B |
DAILY PLF |
81.27 % |
|
C |
DAILY PAF |
87.74 % |
|
D |
CUMMULATIVE PLF |
74.68 % |
|
E |
CUMMULATIVE PAF |
81.17 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
80.07 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
81.27 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.57 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Total Capacity |
4219 |
547 |
2727 |
3233 |
-338 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2197 |
-338 |
9690 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
434 |
60 |
350 |
|
|
|
|
Available |
0 |
480 |
0 |
|
|
|
|
Rest Outage |
287 |
-73 |
0 |
|
|
|
|
Gen/Flow at 7hrs. |
3378 |
80 |
2381 |
2095 |
-338 |
7934 |