Power Supply and Generation Data for 06-July-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
2810 |
2387 |
2450 |
7647 |
22.00 |
|
Min. Demand catered in MW |
2590 |
2029 |
2262 |
6881 |
3.00 |
|
Energy Catered in Mus. |
64.514 |
52.497 |
55.962 |
172.973 |
|
|
Schedule Share |
Central Sector + Bilateral |
54.081 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
1.800 |
|
Bilateral Purchase |
11.048 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.33 |
48.83 |
49.57 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.56 |
11.042 |
10.144 |
12.487 |
42.233 |
|
UGVCL |
4.630 |
3.118 |
15.552 |
8.872 |
32.172 |
|
MGVCL |
3.015 |
5.701 |
1.138 |
9.617 |
19.471 |
|
DGVCL |
4.385 |
5.327 |
0.244 |
15.746 |
25.702 |
|
TOTAL |
20.590 |
25.188 |
27.078 |
46.722 |
119.578 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
64.047Mus |
|
B |
DAILY PLF |
63.25% |
|
C |
DAILY PAF |
75.88% |
|
D |
CUMMULATIVE PLF |
76.61% |
|
E |
CUMMULATIVE PAF |
81.76% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
65.06% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
64.13% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
77.27% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3176 |
59 |
10360 |
|
Capacity Available |
4219 |
547 |
2727 |
2721 |
59 |
10214 |
|
Planned Outage |
630 |
0 |
366 |
|
|
|
|
Force Outage |
365 |
60 |
250 |
|
|
|
|
Available |
0 |
480 |
276 |
|
|
|
|
Restricted Outage |
479 |
1 |
-501 |
|
|
|
|
Gen. / Flow 7hrs. |
2745 |
6 |
2336 |
2451 |
59 |
7538 |