Power Supply and Generation Data for 09-July-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
2935 |
1887 |
3033 |
7855 |
7.0 |
|
Min. Demand catered in MW |
2857 |
1939 |
2432 |
7228 |
4.00 |
|
Energy Catered in MUs |
69.818 |
47.339 |
64.481 |
181.638 |
|
|
Schedule Share in MUs |
Central Sector + Bilateral |
52.381 |
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
10.436 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.12 |
48.82 |
49.37 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.426 |
11.143 |
11.566 |
12.396 |
43.531 |
UGVCL |
4.654 |
3.291 |
15.095 |
9.133 |
32.173 |
MGVCL |
2.928 |
5.757 |
1.351 |
9.626 |
19.662 |
DGVCL |
4.762 |
5.534 |
0.369 |
16.360 |
27.025 |
TOTAL |
20.770 |
25.725 |
28.381 |
47.515 |
122.391 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
68.177 Mus |
|
B |
DAILY PLF |
67.33% |
|
C |
DAILY PAF |
78.55 % |
|
D |
CUMMULATIVE PLF |
76.30% |
|
E |
CUMMULATIVE PAF |
81.76 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
66.15 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
67.68% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
76.96 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3176 |
489 |
10360 |
|
Capacity Available |
4219 |
547 |
2727 |
2399 |
489 |
9892 |
|
Planned Outage |
630 |
0 |
663 |
|
|
|
|
Force Outage |
357 |
135 |
203 |
|
|
|
|
Available |
0 |
330 |
276 |
|
|
|
|
Rest Outage |
441 |
12 |
-85 |
|
|
|
|
Gen/Flow at 7hrs. |
2791 |
70 |
1670 |
2980 |
489 |
7511 |