Power Supply and Generation Data for 31-July-2008
1 Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
2884 |
2155 |
2414 |
7453 |
21.00 |
|
Min. Demand catered in MW |
2766 |
2008 |
1299 |
6073 |
04.00 |
|
Energy Catered in Mus. |
65.994 |
47.986 |
50.147 |
164.127 |
|
|
Schedule Share |
Central Sector + Bilateral |
49.342 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACTION DATA IN Mus :
|
Bilateral Sale |
1.500 |
|
Bilateral Purchase |
6.087 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.03 |
48.81 |
49.31 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.395 |
11.532 |
7.278 |
10.967 |
38.172 |
|
UGVCL |
4.852 |
3.331 |
6.355 |
9.559 |
24.097 |
|
MGVCL |
3.218 |
5.68 |
1.237 |
9.263 |
19.398 |
|
DGVCL |
4.129 |
5.416 |
0.161 |
16.005 |
25.711 |
|
TOTAL |
20.594 |
25.959 |
15.031 |
45.794 |
107.378 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
65.979 mus |
|
B |
DAILY PLF |
65.16% |
|
C |
DAILY PAF |
76.55% |
|
D |
CUMMULATIVE PLF |
75.06% |
|
E |
CUMMULATIVE PAF |
81.68% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
69.95 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
65.33 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.66 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3233 |
362 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2375 |
362 |
9868 |
|
Planned Outage |
420 |
0 |
250 |
|
|
|
|
Force Outage |
320 |
135 |
249 |
|
|
|
|
Available |
90 |
405 |
218 |
|
|
|
|
Restricted Outage |
438 |
6 |
-191 |
|
|
|
|
Gen. / Flow 7hrs. |
2951 |
1 |
1880 |
2207 |
362 |
7039 |
|
|
|
|
|
|
|
|