Power Supply and Generation Data for 04 June 2007

Home                    Past data                   Monthly report

 

      1.                        Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

3335

2889

1386

7610

16.00

Min. Demand catered   in  MW

3185

2660

722

6567

24.00

Energy Catered   in Mus.

83.3203

50.625

34.607

168.535

Schedule Share

Central Sector + Bilateral

45.509

 

 

 

 2.                        BILATERAL TRANSACTION DATA IN Mus :

Bilateral Sale   

1.700

Bilateral Purchase

0.470

3.                        Frequency  :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.02

48.82

49.38

      4.           Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.

UGVCL

8.00

Hours

MGVCL

8.34

Hours

DGVCL

10.15

Hours

PGVCL 

8.36

Hours

Average

8.51

Hours

      5.            Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  79.701mus

B

DAILY PLF

     79.64 %

C

DAILY PAF

 91.37 %

D

CUMMULATIVE PLF

 80.26 %

E

CUMMULATIVE PAF

 81.50 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

 67.41 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

      82.31%

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

      79.68%

      6.           Generation available in MW at 7.00hrs.

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Total Capacity

4238

547

2725

* 2839

       16

9972

Capacity Available

4238

547

2725

1817

 16

9327

Planned Outage

495

0

78

 

 

 

Force Outage

341

60

          140

 

 

 

Available  

0

0

0

 

 

 

Restricted Outage

429

333

235

 

 

 

Gen. / Flow 7hrs.

2974

154

2272

1420

16

6820

 

.