Power Supply and Generation Data for 01 June 2007

Home                    Past data                   Monthly report

 

        1.    Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

3209

2709

2220

8138

15.00

Min. Demand catered   in  MW

3363

2696

1217

7276

5.00

Energy Catered   in Mus.

82.075

53.005

50.608

185.688

Schedule Share

Central Sector + Bilateral

50.814

 

 

 

  2.   BILATERAL TRANSCATION DATA IN Mus :

Bilateral Sale   

0.000

Bilateral Purchase

0.350

  3.   FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

             50.04

48.80

49.27

         4. Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.

UGVCL

7.47

Hours

MGVCL

7.39

Hours

DGVCL

7.30

Hours

PGVCL 

7.51

Hours

Average

7.42

Hours

         5.  Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

        78.295mus

B

DAILY PLF

        78.23 %

C

DAILY PAF

 91.78 %

D

CUMULATIVE PLF

 80.28 %

E

CUMULATIVE PAF

 81.45 %

F

AVAILABILITY FACTOR AT 07.00 HOURS.

 72.92 %

G

DAILY PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS...

 79.44%

H

CUMULATIVE PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS...

 79.59%

          6.   Generation available in MW at 07.00 Hours                  

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4238

547

2725

  2839

16

9972

Capacity Available

4238

547

2725

  2261

16

9771

Planned Outage

166

0

0

 

 

 

Force Outage

386

60

           492

 

 

 

Available  

0

0

0

 

 

 

Restricted Outage

471

333

302

 

 

 

Gen. / Flow 7hrs.

3217

154

1931

2482

54

7784

 

.