Power Supply and Generation Data for 02 June 2007

Home                    Past data                   Monthly report

 

        1. Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

3460

2566

1937

7963

12.00

Min. Demand catered   in  MW

3280

2345

1272

6897

19.30

Energy Catered   in Mus.

83.466

44.955

51.074

179.495

Schedule Share

Central Sector + Bilateral

51.416

 

 

 

 2. BILATERAL TRANSACATION DATA IN Mus:

Bilateral Sale   

1.200

Bilateral Purchase

1.115

 3. FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.35

48.78

49.32

       4. Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.

UGVCL

8.02

Hours

MGVCL

7.46

Hours

DGVCL

8.00

Hours

PGVCL 

7.38

Hours

Average

7.51

Hours

 5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

        79.854mus

B

DAILY PLF

        79.79 %

C

DAILY PAF

 93.22 %

D

CUMMULATIVE PLF

 80.27 %

E

CUMMULATIVE PAF

 81.47 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

 77.29 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

        81.50%

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

        79.60%

       6. Generation available in MW at 07.00 Hours          

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4238

547

2725

2839

     -94

9972

 

Capacity Available

4238

547

2725

2115

-94

9625

Planned Outage

165

0

78

 

 

 

Force Outage

176

60

               265

 

 

 

Available  

0

0

0

 

 

 

Restricted Outage

488

337

481

 

 

 

Gen. / Flow 7hrs.

3409

150

1901

1830

-94

7291