Power Supply and Generation Data for 26 June 2007

Home                    Past data                   Monthly report

 

1.        Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW                   

2082

2144

2122

6348

21.00

Min. Demand catered in MW   

2132

1816

1072

5020

5.00

Energy Catered in MUs.

54.006

37.285

44.213

135.504

Schedule Share

Central Sector + Bilateral

38.033

    2.    BILATERAL TRANSACTION DATA IN MUs:

Bilateral Sale   

0.000

Bilateral Purchase

0.000

3.        FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.34

48.90

49.74

     4.        Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.

UGVCL

10.58

Hours

MGVCL

12.00

Hours

DGVCL

12.00

Hours

PGVCL 

16.38

Hours

Average

12.54

Hours

     5.        Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

53.095Mus

M

DAILY PLF

    53.87%

C

DAILY PAF

70.57%

D

CUMMULATIVE PLF

77.39%

E

CUMMULATIVE PAF

80.93 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

48.02 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

     74.12%

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

    78.34%

     6.         Generation available in MW at 07.00 Hours

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC (GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Tot    Total Capacity

4174

547

2725

* 2839

 15

9908

Capacity Available

4174

547

2725

1720

15

9166

Planned Outage

330

0

0

 

 

 

Force Outage

548

60

15

 

 

 

Available

922

120

 912

 

 

 

Restricted Outage

287

487

182

 

 

 

Gen/Flow at 7hrs.

2088

68

1616

1818

 15

5590