1.
Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
2967 |
2873 |
1957 |
7797 |
12.00 |
|
Min. Demand catered in MW |
2858 |
2883 |
1448 |
7189 |
3.00 |
|
Energy Catered in Mus. |
73.479 |
54.686 |
52.166 |
180.331 |
|
Schedule Share |
Central Sector + Bilateral |
50.396 |
|
|
|
|
2.
BILATERAL TRANSCATION DATA IN Mus :
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.735 |
3.
FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.28 |
48.80 |
49.32 |
4. Average Supply Hours as advice by SLDC Gotri to Agriculture
Areas.
UGVCL
|
7.51 |
Hours |
|
MGVCL |
8.13 |
Hours |
|
DGVCL |
8.00 |
Hours |
|
PGVCL |
8.15 |
Hours |
|
Average |
8.05 |
Hours |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC
ENERGY FOR PLF (EXCLUDING HYDRO) |
69.528 mus |
|
B |
DAILY PLF |
69.47 % |
|
C |
DAILY PAF |
79.74
% |
|
D |
CUMMULATIVE PLF |
79.58
% |
|
E |
CUMMULATIVE PAF |
81.50
% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
71.45
% |
|
G |
DAILY PLF
OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
70.60% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS
IS... |
79.15% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal
|
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC
(GUJ+DD+DNH) |
Bilateral |
TOTAL
GUJARAT |
|
Total Capacity |
4238 |
547 |
2725 |
* 2839 |
54 |
9972
|
|
Capacity Available |
4238 |
547 |
2725 |
2128 |
54 |
9638 |
|
Planned Outage |
495 |
0 |
78 |
|
|
|
|
Force Outage |
206 |
60 |
140 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
386 |
343 |
194 |
|
|
|
|
Gen. / Flow 7hrs. |
3151 |
144 |
2313 |
2062 |
54 |
7671 |
.
|