Power Supply and Generation Data for 30-June-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3060 |
2244 |
2541 |
7845 |
1.00 |
|
Min. Demand catered in MW |
3022 |
2047 |
1964 |
7033 |
8.00 |
|
Energy Catered in Mus. |
74.050 |
51.737 |
53.922 |
179.709 |
|
|
Schedule Share |
Central Sector + Bilateral |
46.777 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
1.176 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.46 |
48.83 |
49.51 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.119 |
11.104 |
10.867 |
10.361 |
40.451 |
|
UGVCL |
4.614 |
3.264 |
17.414 |
8.561 |
33.853 |
|
MGVCL |
3.146 |
5.854 |
1.918 |
9.074 |
19.992 |
|
DGVCL |
4.033 |
5.098 |
0.641 |
15.067 |
24.839 |
|
TOTAL |
19.912 |
25.32 |
30.84 |
43.063 |
119.135 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
71.976Mus |
|
B |
DAILY PLF |
71.08% |
|
C |
DAILY PAF |
79.58% |
|
D |
CUMMULATIVE PLF |
77.47% |
|
E |
CUMMULATIVE PAF |
81.86% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
69.16% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
71.48% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
78.15% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3176 |
347 |
10360 |
|
Capacity Available |
4219 |
547 |
2727 |
2259 |
347 |
9752 |
|
Planned Outage |
410 |
0 |
125 |
|
|
|
|
Force Outage |
455 |
60 |
1 72 |
|
|
|
|
Available |
0 |
480 |
0 |
|
|
|
|
Restricted Outage |
436 |
7 |
-130 |
|
|
|
|
Gen. / Flow 7hrs. |
2918 |
0 |
1999 |
2364 |
347 |
7281 |