Power Supply and Generation Data for 10-March-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3553 |
2529 |
2346 |
8428 |
22.00 |
|
Min. Demand catered in MW |
3761 |
2415 |
1610 |
7786 |
5.00 |
|
Energy Catered in Mus. |
85.335 |
60.108 |
49.041 |
194.484 |
|
|
Schedule Share |
Central Sector + Bilateral |
46.639 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
2.500 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.66 |
48.71 |
49.08 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.928 |
10.464 |
20.26 |
11.797 |
51.449 |
|
UGVCL |
3.902 |
2.925 |
24.047 |
8.42 |
39.294 |
|
MGVCL |
2.607 |
5.533 |
3.589 |
7.166 |
18.895 |
|
DGVCL |
4.104 |
5.122 |
2.029 |
15.14 |
26.395 |
|
TOTAL |
19.541 |
24.044 |
49.925 |
42.523 |
136.033 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
80.936Mus |
|
B |
DAILY PLF |
82.50% |
|
C |
DAILY PAF |
87.52% |
|
D |
CUMMULATIVE PLF |
75.03% |
|
E |
CUMMULATIVE PAF |
81.65% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
71.33% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
82.58% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.08% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
14 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2287 |
14 |
9780 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
685 |
60 |
50 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
152 |
407 |
268 |
|
|
|
|
Gen. / Flow 7hrs. |
3262 |
80 |
2409 |
2164 |
14 |
7915 |