Power Supply and Generation Data for 18-March-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3979 |
2519 |
2413 |
8911 |
23.00 |
|
Min. Demand catered in MW |
3570 |
2530 |
2142 |
8242 |
05.00 |
|
Energy Catered in Mus. |
89.698 |
61.752 |
54.182 |
205.632 |
|
|
Schedule Share |
Central Sector + Bilateral |
51.291 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
1.150 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
49.57 |
48.62 |
49.04 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.021 |
11.483 |
20.355 |
12.459 |
53.318 |
|
UGVCL |
4.309 |
3.281 |
25.246 |
9.376 |
42.212 |
|
MGVCL |
2.802 |
5.829 |
3.967 |
7.310 |
19.908 |
|
DGVCL |
4.205 |
5.503 |
2.258 |
16.267 |
28.233 |
|
TOTAL |
20.337 |
26.096 |
51.826 |
45.412 |
143.671 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
86.332Mus |
|
B |
DAILY PLF |
85.26% |
|
C |
DAILY PAF |
92.52% |
|
D |
CUMMULATIVE PLF |
76.01% |
|
E |
CUMMULATIVE PAF |
81.70% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
83.16% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
85.26% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.16% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
-234 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2013 |
-234 |
9506 |
|
Planned Outage |
0 |
0 |
0 |
|
|
|
|
Force Outage |
472 |
120 |
0 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
131 |
271 |
490 |
|
|
|
|
Gen. / Flow 7hrs. |
3616 |
156 |
2237 |
2451 |
-234 |
8460 |