Power Supply and Generation Data for 19-March-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3883 |
2523 |
2398 |
8804 |
12.00 |
|
Min. Demand catered in MW |
3733 |
2264 |
2141 |
8138 |
18.30 |
|
Energy Catered in Mus. |
90.162 |
59.240 |
54.374 |
203.776 |
|
|
Schedule Share |
Central Sector + Bilateral |
50.147 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
1.750 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.03 |
48.67 |
49.03 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.937 |
11.532 |
20.104 |
12.248 |
52.821 |
|
UGVCL |
4.24 |
3.256 |
24.703 |
9.242 |
41.441 |
|
MGVCL |
2.745 |
5.765 |
3.780 |
7.398 |
19.688 |
|
DGVCL |
4.106 |
5.600 |
2.267 |
16.554 |
28.527 |
|
TOTAL |
20.028 |
26.153 |
50.854 |
45.442 |
142.477 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
86.116Mus |
|
B |
DAILY PLF |
85.05% |
|
C |
DAILY PAF |
90.93% |
|
D |
CUMMULATIVE PLF |
75.20% |
|
E |
CUMMULATIVE PAF |
81.71% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
84.33% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
85.12% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.17% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
14 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2262 |
14 |
9753 |
|
Planned Outage |
90 |
0 |
162 |
|
|
|
|
Force Outage |
360 |
120 |
98 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
207 |
270 |
513 |
|
|
|
|
Gen. / Flow 7hrs. |
3562 |
157 |
1954 |
2290 |
14 |
7963 |