Power Supply and Generation Data for 24-March-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3696 |
2401 |
2556 |
8653 |
15.00 |
|
Min. Demand catered in MW |
3348 |
2152 |
2303 |
7803 |
1.00 |
|
Energy Catered in Mus. |
86.944 |
52.649 |
57.372 |
196.965 |
|
|
Schedule Share |
Central Sector + Bilateral |
51.090 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.09 |
48.81 |
49.39 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.134 |
11.157 |
19.12 |
12.563 |
51.974 |
|
UGVCL |
4.259 |
3.159 |
24.458 |
8.208 |
40.084 |
|
MGVCL |
2.868 |
5.776 |
3.655 |
7.427 |
19.726 |
|
DGVCL |
4.265 |
5.099 |
2.117 |
15.071 |
26.552 |
|
TOTAL |
20.526 |
25.191 |
49.35 |
43.269 |
138.336 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.394Mus |
|
B |
DAILY PLF |
83.35% |
|
C |
DAILY PAF |
89.82% |
|
D |
CUMMULATIVE PLF |
76.08% |
|
E |
CUMMULATIVE PAF |
81.75% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
84.91% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
83.56% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.20% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2371 |
16 |
9864 |
|
Planned Outage |
0 |
0 |
162 |
|
|
|
|
Force Outage |
405 |
120 |
175 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
227 |
348 |
175 |
|
|
|
|
Gen. / Flow 7hrs. |
3587 |
79 |
2215 |
2622 |
16 |
8503 |