Power Supply and Generation Data for 31-March-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3528 |
2439 |
2537 |
8504 |
15.00 |
|
Min. Demand catered in MW |
3271 |
2501 |
2139 |
7911 |
18.00 |
|
Energy Catered in Mus. |
81.811 |
54.145 |
60.310 |
196.266 |
|
|
Schedule Share |
Central Sector + Bilateral |
50.682 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.28 |
48.95 |
49.59 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
9.080 |
10.998 |
18.661 |
11.659 |
50.398 |
|
UGVCL |
4.326 |
3.109 |
23.818 |
8.262 |
39.515 |
|
MGVCL |
2.751 |
5.797 |
3.456 |
7.794 |
19.798 |
|
DGVCL |
4.185 |
5.305 |
2.192 |
15.682 |
27.364 |
|
TOTAL |
20.342 |
25.209 |
48.127 |
43.397 |
137.075 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
78.850Mus |
|
B |
DAILY PLF |
77.87% |
|
C |
DAILY PAF |
84.46% |
|
D |
CUMMULATIVE PLF |
75.34% |
|
E |
CUMMULATIVE PAF |
81.72% |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
70.09% |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
78.75% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.24% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
1936 |
16 |
9429 |
|
Planned Outage |
0 |
0 |
78 |
|
|
|
|
Force Outage |
825 |
120 |
175 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
189 |
272 |
155 |
|
|
|
|
Gen. / Flow 7hrs. |
3205 |
155 |
2319 |
2523 |
16 |
8202 |