Power Supply and Generation Data for 01-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3582 |
2565 |
2718 |
8865 |
24.00 |
|
Min. Demand catered in MW |
3433 |
2613 |
2035 |
8081 |
6.00 |
|
Energy Catered In MUs. |
84.752 |
61.584 |
55.756 |
202.092 |
|
|
|
Central Sector + Bilateral (SCH) |
50.007 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
8.144 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.16 |
48.83 |
49.37 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
7.943 |
11.076 |
21.263 |
11.437 |
51.719 |
|
UGVCL |
4.623 |
3.083 |
25.420 |
8.880 |
42.006 |
|
MGVCL |
3.115 |
6.018 |
3.299 |
8.119 |
20.551 |
|
DGVCL |
4.600 |
5.649 |
2.158 |
16.699 |
29.106 |
|
TOTAL |
20.281 |
25.826 |
52.140 |
45.135 |
143.382 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
82.762% |
|
B |
DAILY PLF |
81.73 % |
|
C |
DAILY PAF |
89.12 % |
|
D |
CUMMULATIVE PLF |
74.71 % |
|
E |
CUMMULATIVE PAF |
81.17 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
85.26 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
81.73 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
89.93 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2727 |
3233 |
-284 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2251 |
-284 |
9744 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
224 |
60 |
100 |
|
|
|
|
Available |
0 |
405 |
318 |
|
|
|
|
Rest Outage |
278 |
0 |
65 |
|
|
|
|
Gen/Flow at 7hrs. |
3597 |
82 |
2344 |
2476 |
-284 |
8499 |