Power Supply and Generation Data for 01-March-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

   

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW.             

3582

2565

2718

8865

24.00

Min. Demand catered in MW    

3433

2613

2035

8081

6.00

Energy Catered   

In MUs.

84.752

61.584

55.756

202.092

 

Central Sector + Bilateral (SCH)

50.007

      2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

8.144

Bilateral Purchase

0.000

 

3.      FREQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.16

48.83

49.37

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

7.943

11.076

21.263

11.437

51.719

UGVCL

4.623

3.083

25.420

8.880

42.006

MGVCL

3.115

6.018

3.299

8.119

20.551

DGVCL

4.600

5.649

2.158

16.699

29.106

TOTAL

20.281

25.826

52.140

45.135

143.382

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  82.762%

B

DAILY PLF

  81.73 %

C

DAILY PAF

  89.12 %

D

CUMMULATIVE PLF

  74.71 %

E

CUMMULATIVE PAF

  81.17 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  85.26 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

   81.73 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

   89.93 %

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Total Capacity

4219

547

2727

3233

-284

10417

Capacity Available

4219

547

2727

2251

-284

9744

Planned Outage

120

0

  0

 

 

 

Force Outage

224

60

100

 

 

 

Available

 0

405

 318

 

 

 

Rest Outage

278

0

        65

 

 

 

Gen/Flow at 7hrs.

3597

82

2344

2476

-284

8499