Power Supply and Generation Data for 03-March-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

   

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW      

3571

2620

2731

8922

21.00

Min. Demand catered in MW    

3580

2402

2108

8090

9.00

Energy Catered In MUs.

86.000

61.318

57.266

204.584

 

Central Sector + Bilateral (SCH)

50.091

      2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

8.900

Bilateral Purchase

0.000

 

3.      FREQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

49.81

48.81

49.30

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.706

11.214

20.436

10.231

50.587

UGVCL

4.455

3.404

25.962

9.092

42.913

MGVCL

3.401

6.116

3.352

8.021

20.890

DGVCL

4.587

6.350

2.169

18.770

31.876

TOTAL 

21.149

27.084

51.919

46.114

146.266

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  84.234%

B

DAILY PLF

  83.19 %

C

DAILY PAF

  89.95 %

D

CUMMULATIVE PLF

  74.76 %

E

CUMMULATIVE PAF

  81.18 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  85.07 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

   83.19 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

   74.97 %

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

T       Total Capacity

4219

547

2727

3233

-274

10417

Capacity Available

4219

547

2727

2221

-274

9714

Planned Outage

120

0

  218

 

 

 

Force Outage

294

60

100

 

 

 

Available

 0

405

 0

 

 

 

Rest Outage

216

   2

 -48

 

 

 

Gen/Flow at 7hrs.

3589

80

2457

2232

-274

8358