Power Supply and Generation Data for 04-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3644 |
2801 |
2537 |
8982 |
20.00 |
|
Min. Demand catered in MW |
3630 |
2567 |
2068 |
8265 |
9.00 |
|
Energy Catered In MUs. |
86.841 |
64.861 |
55.465 |
207.167 |
|
|
|
Central Sector + Bilateral (SCH) |
52.240 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
7.200 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
49.76 |
48.79 |
49.20 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
| PGVCL | 8.604 | 11.641 | 21.324 | 11.706 | 53.275 |
| UGVCL | 4.427 | 3.188 | 26.380 | 8.742 | 42.737 |
| MGVCL | 3.321 | 6.120 | 3.378 | 8.082 | 20.901 |
| DGVCL | 4.566 | 6.230 | 2.279 | 18.413 | 31.488 |
| TOTAL | 20.918 | 27.179 | 53.361 | 46.943 | 148.401 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.933% |
|
B |
DAILY PLF |
83.88 % |
|
C |
DAILY PAF |
90.63 % |
|
D |
CUMMULATIVE PLF |
74.79 % |
|
E |
CUMMULATIVE PAF |
81.19 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
86.09 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
83.88% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.00 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2727 |
3233 |
-174 |
10417 |
|
Capacity Available |
4219 |
547 |
2727 |
2326 |
-174 |
9819 |
|
Planned Outage |
120 |
0 |
218 |
|
|
|
|
Force Outage |
224 |
60 |
100 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
243 |
3 |
-417 |
|
|
|
|
Gen/Flow at 7hrs. |
3632 |
79 |
2826 |
1791 |
-174 |
8328 |