Power Supply and Generation Data for 06-March-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

   

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW.             

3673

2703

2772

9148

15.00

Min. Demand catered in MW    

3727

2507

1964

8198

6.00

Energy Catered   

In MUs.

87.274

66.517

54.238

208.029

 

Central Sector + Bilateral (SCH)

49.962

 

     2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

10.200

Bilateral Purchase

0.000

 

3.      REQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.16

48.80

49.25

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.489

11.805

20.345

11.928

52.567

UGVCL

4.375

3.197

25.978

9.429

42.979

MGVCL

3.392

6.063

3.295

7.954

20.704

DGVCL

4.569

5.901

2.175

17.444

30.089

TOTAL

20.825

26.966

51.793

46.755

146.339

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  85.660%

B

DAILY PLF

  84.60 %

C

DAILY PAF

  90.29%

D

CUMMULATIVE PLF

  74.85 %

E

CUMMULATIVE PAF

  81.27 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  83.79 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

   84.60%

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

   75.06 %

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Total  Total Capacity

4219

547

2730

3412

-406

10599

Capacity Available

4219

547

2730

2096

-406

9592

Planned Outage

120

0

  218

 

 

 

Force Outage

344

60

 125

 

 

 

Available

 0

405

 0

 

 

 

Rest Outage

220

   0

  -222

 

 

 

Gen/Flow at 7hrs.

3535

 82

2609

2191

-406

8417