Power Supply and Generation Data for 07-March-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

   

 

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW.             

3574

3015

2352

8941

15.00

Min. Demand catered in MW    

3399

2599

2023

8021

1.00

Energy Catered   

In MUs.

85.647

67.514

49.723

202.884

 

Central Sector + Bilateral (SCH)

47.873

 

     2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

10.049

Bilateral Purchase

0.000

 

3.      FREQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

49.87

48.80

49.25

 

4.        DISCOM-WISE ENERGY IN MUs

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.367

11.598

19.950

11.815

51.730

UGVCL

4.279

2.990

24.250

9.491

41.010

MGVCL

3.230

6.042

3.311

8.052

20.635

DGVCL

4.483

6.135

2.191

18.135

30.944

TOTAL

20.359

26.765

49.702

47.493

144.319

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  84.048MUs

B

DAILY PLF

  83.00 %

C

DAILY PAF

  88.75%

D

CUMMULATIVE PLF

  74.87 %

E

CUMMULATIVE PAF

  81.28 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  85.00 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

  83.00 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

  75.08 %

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Total Total Capacity

4219

547

2730

3412

-345

10599

Capacity Available

4219

547

2730

2151

-345

9647

Planned Outage

120

0

  218

 

 

 

Force Outage

344

60

 0

 

 

 

Available

 0

405

 0

 

 

 

Rest Outage

169

   1

  115

 

 

 

Gen/Flow at 7hrs.

3586

 81

2397

1925

-345

7989