Power Supply and Generation Data for 07-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3574 |
3015 |
2352 |
8941 |
15.00 |
|
Min. Demand catered in MW |
3399 |
2599 |
2023 |
8021 |
1.00 |
|
Energy Catered In MUs. |
85.647 |
67.514 |
49.723 |
202.884 |
|
|
|
Central Sector + Bilateral (SCH) |
47.873 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
10.049 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
49.87 |
48.80 |
49.25 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.367 |
11.598 |
19.950 |
11.815 |
51.730 |
|
UGVCL |
4.279 |
2.990 |
24.250 |
9.491 |
41.010 |
|
MGVCL |
3.230 |
6.042 |
3.311 |
8.052 |
20.635 |
|
DGVCL |
4.483 |
6.135 |
2.191 |
18.135 |
30.944 |
|
TOTAL |
20.359 |
26.765 |
49.702 |
47.493 |
144.319 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.048MUs |
|
B |
DAILY PLF |
83.00 % |
|
C |
DAILY PAF |
88.75% |
|
D |
CUMMULATIVE PLF |
74.87 % |
|
E |
CUMMULATIVE PAF |
81.28 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
85.00 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
83.00 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.08 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Total Capacity |
4219 |
547 |
2730 |
3412 |
-345 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2151 |
-345 |
9647 |
|
Planned Outage |
120 |
0 |
218 |
|
|
|
|
Force Outage |
344 |
60 |
0 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
169 |
1 |
115 |
|
|
|
|
Gen/Flow at 7hrs. |
3586 |
81 |
2397 |
1925 |
-345 |