Power Supply and Generation Data for 08-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3701 |
3113 |
2179 |
8993 |
12.00 |
|
Min. Demand catered in MW |
3570 |
2577 |
1835 |
7982 |
6.00 |
|
Energy Catered In MUs. |
86.567 |
70.711 |
47.396 |
204.674 |
|
|
|
Central Sector + Bilateral (SCH) |
48.830 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
9.700 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.29 |
49.02 |
49.51 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.669 |
11.441 |
20.544 |
11.882 |
52.536 |
|
UGVCL |
4.446 |
2.984 |
25.651 |
9.068 |
42.149 |
|
MGVCL |
3.384 |
6.016 |
3.229 |
7.919 |
20.548 |
|
DGVCL |
4.586 |
6.040 |
2.181 |
17.849 |
30.656 |
|
TOTAL |
21.085 |
26.481 |
51.605 |
46.718 |
145.889 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.966% |
|
B |
DAILY PLF |
83.91% |
|
C |
DAILY PAF |
88.45 % |
|
D |
CUMMULATIVE PLF |
74.90 % |
|
E |
CUMMULATIVE PAF |
81.29 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
84.26 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
83.91 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.11 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
-286 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2037 |
-286 |
9533 |
|
Planned Outage |
120 |
0 |
218 |
|
|
|
|
Force Outage |
344 |
60 |
0 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
200 |
1 |
-487 |
|
|
|
|
Gen/Flow at 7hrs. |
3555 |
81 |
2999 |
1682 |
-286 |
8317 |