Power Supply and Generation Data for 08-March-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

   

 

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW.             

3701

3113

2179

8993

12.00

Min. Demand catered in MW    

3570

2577

1835

7982

6.00

Energy Catered   

In MUs.

86.567

70.711

47.396

204.674

 

Central Sector + Bilateral (SCH)

48.830

      2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

9.700

Bilateral Purchase

0.000

 

3.      FREQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.29

49.02

49.51

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.669

11.441

20.544

11.882

52.536

UGVCL

4.446

2.984

25.651

9.068

42.149

MGVCL

3.384

6.016

3.229

7.919

20.548

DGVCL

4.586

6.040

2.181

17.849

30.656

TOTAL

21.085

26.481

51.605

46.718

145.889

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  84.966%

B

DAILY PLF

  83.91%

C

DAILY PAF

  88.45 %

D

CUMMULATIVE PLF

  74.90 %

E

CUMMULATIVE PAF

  81.29 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  84.26 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

  83.91 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

  75.11 %

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Total Capacity

4219

547

2730

3412

-286

10599

Capacity Available

4219

547

2730

2037

-286

9533

Planned Outage

120

0

  218

 

 

 

Force Outage

344

60

 0

 

 

 

Available

 0

405

 0

 

 

 

Rest Outage

200

   1

-487

 

 

 

Gen/Flow at 7hrs.

3555

 81

2999

1682

-286

8317