Power Supply and Generation Data for 09-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3610 |
3085 |
2503 |
9198 |
23.00 |
|
Min. Demand catered in MW |
3552 |
3178 |
1409 |
8136 |
6.00 |
|
Energy Catered In MUs. |
85.744 |
70.183 |
50.138 |
206.065 |
|
|
|
Central Sector + Bilateral (SCH) |
46.581 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
8.467 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
49.86 |
48.81 |
49.33 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.510 |
11.643 |
20.437 |
11.913 |
52.503 |
|
UGVCL |
4.331 |
3.040 |
25.706 |
8.206 |
41.283 |
|
MGVCL |
3.394 |
6.095 |
3.200 |
8.126 |
20.815 |
|
DGVCL |
4.517 |
6.013 |
2.154 |
17.773 |
30.457 |
|
TOTAL |
20.752 |
26.791 |
51.497 |
46.018 |
145.058 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.032% |
|
B |
DAILY PLF |
82.99% |
|
C |
DAILY PAF |
88.45 % |
|
D |
CUMMULATIVE PLF |
74.92 % |
|
E |
CUMMULATIVE PAF |
81.29 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
85.07 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
82.99 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.13 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
-346 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2040 |
-346 |
9536 |
|
Planned Outage |
120 |
0 |
218 |
|
|
|
|
Force Outage |
344 |
60 |
99 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
166 |
2 |
-598 |
|
|
|
|
Gen/Flow at 7hrs. |
3589 |
80 |
3011 |
1593 |
-346 |
8273 |