Power Supply and Generation Data for 11-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3550 |
2691 |
2019 |
8260 |
1.00 |
|
Min. Demand catered in MW |
2742 |
1837 |
1107 |
5686 |
19.00 |
|
Energy Catered In MUs. |
72.312 |
49.768 |
40.345 |
162.425 |
|
|
|
Central Sector + Bilateral (SCH) |
53.405 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.54 |
49.42 |
49.92 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
| PGVCL | 8.471 | 8.963 | 21.253 | 6.581 | 45.268 |
| UGVCL | 4.278 | 2.579 | 25.580 | 5.145 | 37.582 |
| MGVCL | 3.199 | 5.213 | 2.997 | 6.396 | 17.805 |
| DGVCL | 4.619 | 3.605 | 2.141 | 10.656 | 21.021 |
| TOTAL | 20.567 | 20.360 | 51.971 | 28.778 | 121.676 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
70.798MUs |
|
B |
DAILY PLF |
69.92 % |
|
C |
DAILY PAF |
90.39% |
|
D |
CUMMULATIVE PLF |
74.94 % |
|
E |
CUMMULATIVE PAF |
81.30 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
79.19 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
83.61% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.18 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
-356 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
1985 |
-356 |
9481 |
|
Planned Outage |
120 |
0 |
218 |
|
|
|
|
Force Outage |
304 |
60 |
98 |
|
|
|
|
Available |
113 |
405 |
172 |
|
|
|
|
Rest Outage |
341 |
0 |
327 |
|
|
|
|
Gen/Flow at 7hrs. |
3341 |
82 |
1915 |
1721 |
-356 |
7059 |