Power Supply and Generation Data for 11-March-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

   

 

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW.             

3550

2691

2019

8260

1.00

Min. Demand catered in MW    

2742

1837

1107

5686

19.00

Energy Catered In MUs.

72.312

49.768

40.345

162.425

 

Central Sector + Bilateral (SCH)

53.405

      2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

0.000

Bilateral Purchase

0.000

 

3.      FREQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.54

49.42

49.92

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL 8.471 8.963 21.253 6.581 45.268
UGVCL 4.278 2.579 25.580 5.145 37.582
MGVCL 3.199 5.213 2.997 6.396 17.805
DGVCL 4.619 3.605 2.141 10.656 21.021
TOTAL  20.567 20.360 51.971 28.778 121.676

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  70.798MUs

B

DAILY PLF

  69.92 %

C

DAILY PAF

  90.39%

D

CUMMULATIVE PLF

  74.94 %

E

CUMMULATIVE PAF

  81.30 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  79.19 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

  83.61%

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

  75.18 %

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

         Total Capacity

4219

547

2730

3412

-356

10599

Capacity Available

4219

547

2730

1985

-356

9481

Planned Outage

120

0

218

 

 

 

Force Outage

304

60

98

 

 

 

Available

113

405

172

 

 

 

Rest Outage

341

0

327

 

 

 

Gen/Flow at 7hrs.

3341

82

1915

1721

-356

7059