Power Supply and Generation Data for 12-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3496 |
3033 |
2095 |
8624 |
24.00 |
|
Min. Demand catered in MW |
2744 |
1948 |
2146 |
6838 |
5.00 |
|
Energy Catered In MUs. |
78.683 |
58.673 |
50.418 |
187.774 |
|
|
|
Central Sector + Bilateral (SCH) |
48.406 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
5.814 |
|
Bilateral Purchase |
0.000 |
3. REQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.49 |
49.18 |
49.87 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.470 |
10.795 |
20.446 |
8.742 |
48.453 |
|
UGVCL |
4.414 |
3.048 |
25.875 |
7.139 |
40.476 |
|
MGVCL |
3.332 |
5.513 |
3.108 |
6.875 |
18.828 |
|
DGVCL |
4.406 |
4.580 |
2.082 |
13.539 |
24.607 |
|
TOTAL |
20.622 |
23.936 |
51.511 |
36.295 |
132.364 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
77.269Mus |
|
B |
DAILY PLF |
76.31% |
|
C |
DAILY PAF |
86.02 % |
|
D |
CUMMULATIVE PLF |
74.94 % |
|
E |
CUMMULATIVE PAF |
81.25 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
86.16 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.29 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.19% |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Total Capacity |
4219 |
547 |
2730 |
3412 |
-318 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2007 |
-318 |
9503 |
|
Planned Outage |
120 |
0 |
218 |
|
|
|
|
Force Outage |
184 |
60 |
50 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
280 |
1 |
14 |
|
|
|
|
Gen/Flow at 7hrs. |
3635 |
81 |
2448 |
1713 |
-318 |
7877 |