Power Supply and Generation Data for 13-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3605 |
3038 |
2228 |
8871 |
15.00 |
|
Min. Demand catered in MW |
3579 |
2632 |
1727 |
7938 |
6.00 |
|
Energy Catered In MUs. |
87.287 |
67.421 |
48.119 |
202.827 |
|
|
|
Central Sector + Bilateral (SCH) |
53.656 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
3.283 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.31 |
48.89 |
49.51 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.729 |
11.469 |
20.352 |
11.191 |
51.741 |
|
UGVCL |
4.495 |
3.104 |
25.169 |
8.716 |
41.484 |
|
MGVCL |
3.408 |
5.893 |
3.041 |
7.785 |
20.127 |
|
DGVCL |
4.565 |
5.728 |
2.090 |
16.931 |
29.314 |
|
TOTAL |
21.197 |
26.194 |
50.652 |
44.623 |
142.666 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
85.990% |
|
B |
DAILY PLF |
84.92% |
|
C |
DAILY PAF |
90.55 % |
|
D |
CUMMULATIVE PLF |
74.97 % |
|
E |
CUMMULATIVE PAF |
81.19 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
86.92 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
85.76 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.23 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
-76 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2502 |
-76 |
9998 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
184 |
60 |
0 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
248 |
1 |
-145 |
|
|
|
|
Gen/Flow at 7hrs. |
3667 |
81 |
2875 |
1566 |
-76 |
8189 |