Power Supply and Generation Data for 14-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3715 |
3195 |
1993 |
8903 |
16.00 |
|
Min. Demand catered in MW |
3597 |
2579 |
1960 |
8136 |
5.00 |
|
Energy Catered In MUs. |
87.435 |
68.834 |
47.934 |
204.203 |
|
|
|
Central Sector + Bilateral (SCH) |
56.081 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
2.905 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.24 |
49.06 |
49.62 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.839 |
11.625 |
19.871 |
11.789 |
52.124 |
|
UGVCL |
4.560 |
3.164 |
24.154 |
9.253 |
41.131 |
|
MGVCL |
3.450 |
6.061 |
2.984 |
8.206 |
20.701 |
|
DGVCL |
4.541 |
5.943 |
2.074 |
17.566 |
30.124 |
|
TOTAL |
21.390 |
26.793 |
49.083 |
46.814 |
144.080 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
86.052MUs |
|
B |
DAILY PLF |
84.98% |
|
C |
DAILY PAF |
90.55 % |
|
D |
CUMMULATIVE PLF |
75.00 % |
|
E |
CUMMULATIVE PAF |
81.14 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
83.92 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.98 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.04% |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Total Capacity |
4219 |
547 |
2730 |
3412 |
-310 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2357 |
-310 |
9853 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
304 |
60 |
0 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
284 |
2 |
396 |
|
|
|
|
Gen/Flow at 7hrs. |
3511 |
80 |
2481 |
1954 |
-310 |
8026 |