Power Supply and Generation Data for 15-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3637 |
2684 |
2649 |
8970 |
23.00 |
|
Min. Demand catered in MW |
3444 |
2609 |
1895 |
7948 |
6.00 |
|
Energy Catered In MUs. |
84.813 |
64.509 |
52.388 |
201.710 |
|
|
|
Central Sector + Bilateral (SCH) |
53.553 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
7.360 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.29 |
49.22 |
49.75 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.937 |
11.289 |
21.037 |
11.444 |
52.707 |
|
UGVCL |
4.441 |
3.133 |
24.097 |
8.783 |
40.454 |
|
MGVCL |
3.469 |
5.975 |
2.905 |
8.058 |
20.407 |
|
DGVCL |
4.638 |
5.752 |
2.215 |
17.006 |
29.611 |
|
TOTAL |
21.485 |
26.149 |
50.254 |
45.291 |
143.179 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
83.448% |
|
B |
DAILY PLF |
82.41% |
|
C |
DAILY PAF |
88.66 % |
|
D |
CUMMULATIVE PLF |
75.02 % |
|
E |
CUMMULATIVE PAF |
81.14 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
82.72 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.10 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.28 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
-348 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2227 |
-348 |
9723 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
234 |
60 |
0 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
375 |
1 |
88 |
|
|
|
|
Gen/Flow at 7hrs. |
3490 |
81 |
2642 |
2041 |
-348 |
8254 |