Power Supply and Generation Data for 16-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3546 |
3097 |
2193 |
8836 |
19.30 |
|
Min. Demand catered in MW |
3626 |
2522 |
1889 |
8037 |
9.00 |
|
Energy Catered In MUs. |
86.216 |
67.819 |
50.275 |
204.310 |
|
|
|
Central Sector + Bilateral (SCH) |
51.866 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
7.425 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.26 |
49.09 |
49.63 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.797 |
11.905 |
20.703 |
11.901 |
53.306 |
|
UGVCL |
4.452 |
3.203 |
24.509 |
8.670 |
40.834 |
|
MGVCL |
3.466 |
6.112 |
3.114 |
8.183 |
20.875 |
|
DGVCL |
4.692 |
5.719 |
2.230 |
16.904 |
29.545 |
|
TOTAL |
21.407 |
26.939 |
50.556 |
45.658 |
144.560 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.833% |
|
B |
DAILY PLF |
83.78% |
|
C |
DAILY PAF |
89.58 % |
|
D |
CUMMULATIVE PLF |
75.04 % |
|
E |
CUMMULATIVE PAF |
81.15 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
82.52 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.82 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.31 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
-36 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2628 |
-36 |
10124 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
114 |
60 |
0 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
377 |
1 |
99 |
|
|
|
|
Gen/Flow at 7hrs. |
3608 |
81 |
2631 |
1891 |
-36 |
8211 |