Power Supply and Generation Data for 17-March-2009

 Home          Past Data         Monthly report           Trend           Unit outage

   

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW

3737

2947

2280

8964

16.00

Min. Demand catered in MW    

3556

2708

1841

8105

5.00

Energy Catered In MUs.

86.810

68.078

50.483

205.371

 

Central Sector + Bilateral (SCH)

55.525

      2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

4.220

Bilateral Purchase

0.000

 

3.      FREQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.16

48.90

49.43

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.690

11.222

20.540

11.365

51.817

UGVCL

4.608

3.390

25.116

8.786

41.900

MGVCL

3.446

6.269

3.097

8.597

21.409

DGVCL

4.680

5.752

2.408

17.002

29.842

TOTAL

21.424

26.633

51.161

45.750

144.968

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  85.428Mus

B

DAILY PLF

  84.37%

C

DAILY PAF

  89.58 %

D

CUMMULATIVE PLF

  75.07 %

E

CUMMULATIVE PAF

  81.16 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  78.29 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...             

  84.87 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

  75.33%

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

         Total Capacity

4219

547

2730

3412

41

10599

Capacity Available

4219

547

2730

2713

41

10209

Planned Outage

120

0

0

 

 

 

Force Outage

324

60

0

 

 

 

Available

0

480

0

 

 

 

Rest Outage

472

2

217

 

 

 

Gen/Flow at 7hrs.

3303

5

2513

2296

41

8117