Power Supply and Generation Data for 18-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3680 |
3089 |
2411 |
9180 |
24.00 |
|
Min. Demand catered in MW |
3443 |
2792 |
2087 |
8322 |
5.00 |
|
Energy Catered In MUs. |
86.122 |
69.727 |
53.774 |
209.623 |
|
|
|
Central Sector + Bilateral (SCH) |
58.238 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
2.990 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.17 |
48.85 |
49.3 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.693 |
11.55 |
20.56 |
12.804 |
53.607 |
|
UGVCL |
4.481 |
3.282 |
24.65 |
8.606 |
40.934 |
|
MGVCL |
3.452 |
6.208 |
3.131 |
8.411 |
21.202 |
|
DGVCL |
4.647 |
6.025 |
2.294 |
17.809 |
30.775 |
|
TOTAL |
21.273 |
27.065 |
50.55 |
47.63 |
146.518 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.37Mus |
|
B |
DAILY PLF |
90.45% |
|
C |
DAILY PAF |
89.58 % |
|
D |
CUMMULATIVE PLF |
75.1 % |
|
E |
CUMMULATIVE PAF |
81.16 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
87.53 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.69 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.36% |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
-361 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2225 |
-361 |
9721 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
114 |
60 |
0 |
|
|
|
|
Available |
0 |
480 |
0 |
|
|
|
|
Rest Outage |
292 |
2 |
144 |
|
|
|
|
Gen/Flow at 7hrs. |
3693 |
5 |
2874 |
1726 |
-361 |
8298 |