Power Supply and Generation Data for 18-March-2009

 Home          Past Data         Monthly report           Trend           Unit outage

   

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW

3680

3089

2411

9180

24.00

Min. Demand catered in MW    

3443

2792

2087

8322

5.00

Energy Catered In MUs.

86.122

69.727

53.774

209.623

 

Central Sector + Bilateral (SCH)

58.238

      2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

2.990

Bilateral Purchase

0.000

 

3.      FREQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.17

48.85

49.3

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.693

11.55

20.56

12.804

53.607

UGVCL

4.481

3.282

24.65

8.606

40.934

MGVCL

3.452

6.208

3.131

8.411

21.202

DGVCL

4.647

6.025

2.294

17.809

30.775

TOTAL

21.273

27.065

50.55

47.63

146.518

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  84.37Mus

B

DAILY PLF

  90.45%

C

DAILY PAF

  89.58 %

D

CUMMULATIVE PLF

  75.1 %

E

CUMMULATIVE PAF

  81.16 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  87.53 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...             

  84.69 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

  75.36%

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

         Total Capacity

4219

547

2730

3412

-361

10599

Capacity Available

4219

547

2730

2225

-361

9721

Planned Outage

120

0

0

 

 

 

Force Outage

114

60

0

 

 

 

Available

0

480

0

 

 

 

Rest Outage

292

2

144

 

 

 

Gen/Flow at 7hrs.

3693

5

2874

1726

-361

8298