Power Supply and Generation Data for 21-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3622 |
3024 |
2596 |
9242 |
16.00 |
|
Min. Demand catered in MW |
3553 |
2552 |
2094 |
8199 |
24.00 |
|
Energy Catered In MUs. |
86.730 |
65.362 |
56.344 |
208.436 |
|
|
|
Central Sector + Bilateral (SCH) |
52.401 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
8.064 |
|
Bilateral Purchase |
0.0 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.42 |
49.24 |
49.80 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.923 |
12.108 |
20.054 |
12.260 |
53.345 |
|
UGVCL |
4.724 |
3.433 |
22.739 |
8.849 |
39.745 |
|
MGVCL |
3.592 |
6.213 |
3.143 |
8.272 |
21.220 |
|
DGVCL |
4.725 |
6.130 |
2.260 |
18.118 |
31.233 |
|
TOTAL |
21.964 |
27.884 |
48.196 |
47.499 |
145.543 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
86.037Mus |
|
B |
DAILY PLF |
84.97% |
|
C |
DAILY PAF |
91.77 % |
|
D |
CUMMULATIVE PLF |
75.19 % |
|
E |
CUMMULATIVE PAF |
81.18 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
78.48 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
85.75 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.20% |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
93 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2588 |
93 |
10084 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
234 |
60 |
0 |
|
|
|
|
Available |
155 |
330 |
0 |
|
|
|
|
Rest Outage |
399 |
-3 |
557 |
|
|
|
|
Gen/Flow at 7hrs. |
3311 |
160 |
2173 |
1821 |
93 |
7465 |