Power Supply and Generation Data for 22-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
33.73 |
2555 |
2985 |
8913 |
24.00 |
|
Min. Demand catered in MW |
2982 |
2438 |
1502 |
6922 |
4.00 |
|
Energy Catered In MUs. |
79.694 |
60.983 |
55.281 |
195.958 |
|
|
|
Central Sector + Bilateral (SCH) |
54.557 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
0.050 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.37 |
49.41 |
49.90 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.940 |
11.440 |
19.533 |
11.874 |
51.787 |
|
UGVCL |
4.079 |
2.933 |
18.384 |
7.622 |
33.018 |
|
MGVCL |
3.447 |
6.130 |
3.095 |
8.265 |
20.937 |
|
DGVCL |
4.894 |
5.858 |
2.181 |
17.316 |
30.249 |
|
TOTAL |
21.360 |
26.361 |
43.193 |
45.077 |
135.991 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
77.723% |
|
B |
DAILY PLF |
76.76% |
|
C |
DAILY PAF |
88.20 % |
|
D |
CUMMULATIVE PLF |
75.19 % |
|
E |
CUMMULATIVE PAF |
81.19 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
81.42 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
81.87 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.46 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
93 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2707 |
93 |
10203 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
305 |
60 |
0 |
|
|
|
|
Available |
45 |
480 |
0 |
|
|
|
|
Rest Outage |
314 |
2 |
290 |
|
|
|
|
Gen/Flow at 7hrs. |
3435 |
5 |
2440 |
2069 |
93 |
7949 |