Power Supply and Generation Data for 23-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3447 |
3038 |
2802 |
9287 |
15.00 |
|
Min. Demand catered in MW |
3199 |
2489 |
2339 |
8027 |
5.00 |
|
Energy Catered In MUs. |
81.297 |
68.256 |
59.697 |
209.250 |
|
|
|
Central Sector + Bilateral (SCH) |
56.314 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
4.992 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.19 |
49.19 |
49.67 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.047 |
12.136 |
20.202 |
12.207 |
53.592 |
|
UGVCL |
4.717 |
3.377 |
22.697 |
8.170 |
38.961 |
|
MGVCL |
3.566 |
6.253 |
3.149 |
8.390 |
21.358 |
|
DGVCL |
4.767 |
6.068 |
2.199 |
17.937 |
30.971 |
|
TOTAL |
22.097 |
27.834 |
48.247 |
46.704 |
144.882 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
80.420% |
|
B |
DAILY PLF |
79.42% |
|
C |
DAILY PAF |
86.70 % |
|
D |
CUMMULATIVE PLF |
75.20 % |
|
E |
CUMMULATIVE PAF |
81.19 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
79.81 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.52 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.47 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
-154 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2492 |
-154 |
9988 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
440 |
60 |
0 |
|
|
|
|
Available |
0 |
405 |
0 |
|
|
|
|
Rest Outage |
292 |
2 |
118 |
|
|
|
|
Gen/Flow at 7hrs. |
3367 |
8 |
2612 |
2203 |
-154 |
8262 |