Power Supply and Generation Data for 27-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3621 | 2353 | 3414 | 9388 | 2400 |
|
Min. Demand catered in MW |
3461 | 2379 | 2633 | 8473 | 900 |
|
Energy Catered In MUs. |
85.827 |
61.282 |
65.807 |
212.916 |
|
|
|
Central Sector + Bilateral (SCH) |
59.264 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
0.65 |
|
Bilateral Purchase |
0 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
| 50.34 | 49.25 | 49.82 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.221 | 12.347 | 21.073 | 12.081 | 54.722 |
|
UGVCL |
4.819 | 3.602 | 25.067 | 9.617 | 43.105 |
|
MGVCL |
3.622 | 6.3 | 3.338 | 8.258 | 21.518 |
|
DGVCL |
4.838 | 6.019 | 2.295 | 17.793 | 30.945 |
|
TOTAL |
22.5 | 28.268 | 51.773 | 47.749 | 150.29 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
84.283 mus |
|
B |
DAILY PLF |
83.24 % |
|
C |
DAILY PAF |
92.61 % |
|
D |
CUMMULATIVE PLF |
75.28 % |
|
E |
CUMMULATIVE PAF |
81.22 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
83.1 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
84.42 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.57 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Total Capacity |
4219 | 547 | 2730 | 3412 | 104 | 10599 |
|
Capacity Available |
4219 | 547 | 2730 | 2602 | 104 | 10098 |
|
Planned Outage |
120 | 0 | 0 | 0 | 0 | 0 |
|
Force Outage |
120 | 60 | 0 | 0 | 0 | 0 |
|
Available |
222 | 330 | 390 | 0 | 0 | 0 |
|
Rest Outage |
251 | 3 | 137 | 0 | 0 | 0 |
|
Gen/Flow at 7hrs. |
3506 | 154 | 2203 | 2440 | 104 | 8303 |