Power Supply and Generation Data for 28-March-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

   

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW.             

3492 2825 2908 9225 16

Min. Demand catered in MW    

3657 2327 2310 8294 8

Energy Catered   

In MUs.

85.6 58.277 67.213 211.09

 

Central Sector + Bilateral (SCH)

59.25

      2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

0

Bilateral Purchase

0

 

3.      FREQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.27 49 49.76

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

9.205 12.158 20.579 12.5 54.442

UGVCL

4.918 3.477 25.288 9.282 42.965

MGVCL

3.546 6.252 3.35 8.161 21.309

DGVCL

4.87 5.959 2.222 17.615 30.666

TOTAL

22.539 27.846 51.439 47.558 149.382

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

83.864MUs

B

DAILY PLF

82.82%

C

DAILY PAF

91.35%

D

CUMMULATIVE PLF

75.3%

E

CUMMULATIVE PAF

81.23%

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

79.5%

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

83.66%

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

75.6%

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Total Total Capacity
4219 547 2730 3412 104 10599

Capacity Available

4219 547 2730 2508 104 10004

Planned Outage

120 0 0 0 0 0

Force Outage

120 60 0 0 0 0

Available

222 405 390 0 0 0

Rest Outage

403 4 322 0 0 0

Gen/Flow at 7hrs.

3354 78 2018 2706 104 8156