Power Supply and Generation Data for 29-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3473 |
2350 |
3348 |
9171 |
24.00 |
|
Min. Demand catered in MW |
3261 |
2195 |
2660 |
8116 |
8.00 |
|
Energy Catered In MUs. |
82.288 |
55.703 |
67.992 |
205.983 |
|
|
|
Central Sector + Bilateral (SCH) |
59.325 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.44 |
49.42 |
49.97 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
9.295 |
11.607 |
20.281 |
12.510 |
53.693 |
|
UGVCL |
4.958 |
3.429 |
25.077 |
9.110 |
42.574 |
|
MGVCL |
3.594 |
6.252 |
3.364 |
8.141 |
21.351 |
|
DGVCL |
4.843 |
5.850 |
2.361 |
17.292 |
30.346 |
|
TOTAL |
22.690 |
27.138 |
51.083 |
47.053 |
147.964 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
80.292% |
|
B |
DAILY PLF |
79.29% |
|
C |
DAILY PAF |
91.35 % |
|
D |
CUMMULATIVE PLF |
75.31 % |
|
E |
CUMMULATIVE PAF |
81.23 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
78.19 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
81.02 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.61 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
92 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2593 |
92 |
10089 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
330 |
60 |
0 |
|
|
|
|
Available |
222 |
405 |
390 |
|
|
|
|
Rest Outage |
248 |
2 |
195 |
|
|
|
|
Gen/Flow at 7hrs. |
3299 |
80 |
2145 |
2798 |
92 |
8322 |