Power Supply and Generation Data for 30-March-2009
1. MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM
|
MW FOR |
GSEC |
PVT |
CEN.SEC. |
TOTAL |
TIME |
|
Max. Demand catered in MW. |
3583 |
2559 |
3234 |
9376 |
23.00 |
|
Min. Demand catered in MW |
3027 |
1840 |
1950 |
6817 |
13.00 |
|
Energy Catered In MUs. |
77.592 |
55.447 |
72.612 |
205.651 |
|
|
|
Central Sector + Bilateral (SCH) |
60.203 |
|||
2. BILATERAL TRANSACTION DATA IN MUs
|
Bilateral Sale |
1.203 |
|
Bilateral Purchase |
0.000 |
3. FREQUENCY
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day |
|
50.49 |
49.16 |
49.90 |
4. DISCOM-WISE ENERGY IN MUs.
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.771 |
11.685 |
18.476 |
11.965 |
50.897 |
|
UGVCL |
4.924 |
3.536 |
25.853 |
8.058 |
42.371 |
|
MGVCL |
3.730 |
6.275 |
3.468 |
7.960 |
21.433 |
|
DGVCL |
4.909 |
6.023 |
2.404 |
17.805 |
31.141 |
|
TOTAL |
22.334 |
27.519 |
50.201 |
45.788 |
145.842 |
5. PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
75.976% |
|
B |
DAILY PLF |
75.03% |
|
C |
DAILY PAF |
91.35 % |
|
D |
CUMMULATIVE PLF |
75.31 % |
|
E |
CUMMULATIVE PAF |
81.24 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
82.98 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
75.75 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS… |
75.61 % |
6. GENERATION AVAILABLE IN MW AT 07 Hrs
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+215 ) + W/M |
CEN.SEC(GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
Total Capacity |
4219 |
547 |
2730 |
3412 |
-322 |
10599 |
|
Capacity Available |
4219 |
547 |
2730 |
2172 |
-322 |
9668 |
|
Planned Outage |
120 |
0 |
0 |
|
|
|
|
Force Outage |
240 |
60 |
0 |
|
|
|
|
Available |
110 |
405 |
172 |
|
|
|
|
Rest Outage |
248 |
2 |
99 |
|
|
|
|
Gen/Flow at 7hrs. |
3501 |
80 |
2459 |
2446 |
-322 |
8486 |