Power Supply and Generation Data for 30-March-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

   

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW.             

3583

2559

3234

9376

23.00

Min. Demand catered in MW    

3027

1840

1950

6817

13.00

Energy Catered   

In MUs.

77.592

55.447

72.612

205.651

 

Central Sector + Bilateral (SCH)

60.203

      2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

1.203

Bilateral Purchase

0.000

 

3.      FREQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.49

49.16

49.90

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.771

11.685

18.476

11.965

50.897

UGVCL

4.924

3.536

25.853

8.058

42.371

MGVCL

3.730

6.275

3.468

7.960

21.433

DGVCL

4.909

6.023

2.404

17.805

31.141

TOTAL

22.334

27.519

50.201

45.788

145.842

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  75.976%

B

DAILY PLF

  75.03%

C

DAILY PAF

  91.35 %

D

CUMMULATIVE PLF

  75.31 %

E

CUMMULATIVE PAF

  81.24 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  82.98 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

  75.75 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

  75.61 %

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Total Capacity

4219

547

2730

3412

-322

10599

Capacity Available

4219

547

2730

2172

-322

 9668

Planned Outage

120

0

0

 

 

 

Force Outage

240

60

0

 

 

 

Available

110

405

172

 

 

 

Rest Outage

248

2

 99

 

 

 

Gen/Flow at 7hrs.

3501

80

2459

2446

-322

8486