Power Supply and Generation Data for 10 May 2007

Home                    Past data                   Monthly report

 

         1.   Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

3282

2775

2149

8206

7.00

Min. Demand catered   in  MW

3276

2531

1647

7454

19.00

Energy Catered   in Mus.

82.801

50.698

55.538

189.037

Schedule Share

Central Sector + Bilateral

51.341

 

 

 

    2    BILATERAL TRANSACTION DATA IN Mus :

Bilateral Sale   

0.000

Bilateral Purchase

1.260

    3.   FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

             50.33

49.03

49.71

          4.  Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.

UGVCL

8.00

Hours

MGVCL

8.30

Hours

DGVCL

8.30

Hours

PGVCL 

8.30

Hours

Average

8.23

Hours

          5.  Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

       79.508 mus

B

DAILY PLF

       78.68 %

C

DAILY PAF

  95.02 %

D

CUMULATIVE PLF

 80.72 %

E

CUMULATIVE PAF

 81.13 %

F

AVAILABILITY FACTOR AT 07.00 HOURS.

 76.12 %

G

DAILY PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS...

        80.32 %

H

CUMULATIVE PLF OF GSEC UNIT WITH BACK DOWN AND AVAILABLE UNITS IS...

 79.05%

          6.  Generation available in MW at 07.00 Hours                  

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4238

547

2725

  2839

16

9972

 

Capacity Available

4238

547

2725

  2070

16

9580

Planned Outage

216

0

0

 

 

 

Force Outage

188

60

          196

 

 

 

Available  

0

0

0

 

 

 

Restricted Outage

477

334

455

 

 

 

Gen. / Flow 7hrs.

3358

153

2074

2192

16

7777

 

.