Power Supply and Generation Data for 25 May 2007

Home                    Past data                   Monthly report

 

     1. Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered  in  MW

3298

2788

1932

8018

7.00

Min. Demand catered   in  MW

3245

2833

1200

7278

18.30

Energy Catered   in Mus.

84.509

56.916

42.459

183.884

Schedule Share

Central Sector + Bilateral

48.629

 

 

 

 2. BILATERAL TRANSACTION DATA IN Mus:

Bilateral Sale   

                                 1.250

Bilateral Purchase

                                 0.315

 3. FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

50.05

48.85

49.34

      4. Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.

UGVCL

                       8.27

Hours

MGVCL

8.30

Hours

DGVCL

8.00

Hours

PGVCL 

8.00

Hours

Average

8.14

Hours

  5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

       80.580mus

B

DAILY PLF

         80.51 %

C

DAILY PAF

  92.97 %

D

CUMMULATIVE PLF

   80.20 %

E

CUMMULATIVE PAF

   81.34 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

   78.02 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

    81.15 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...

     79.22 %

        6. Generation available in MW at 07.00 Hours          

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4238

547

2725

* 2839

-186

9972

 

Capacity Available

4238

547

2725

1893

-186

9403

Planned Outage

195

0

0

 

 

 

Force Outage

243

60

125

 

 

 

Available  

0

0

0

 

 

 

Restricted Outage

359

333

237

 

 

 

Gen. / Flow 7hrs.

3442

154

2363

1861

-186

7820