1. Max.
Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3298 |
2788 |
1932 |
8018 |
7.00 |
|
Min. Demand catered in MW |
3245 |
2833 |
1200 |
7278 |
18.30 |
|
Energy Catered in Mus. |
84.509 |
56.916 |
42.459 |
183.884 |
|
Schedule Share |
Central Sector +
Bilateral |
48.629 |
|
|
|
|
2. BILATERAL TRANSACTION DATA IN
Mus:
|
Bilateral Sale |
1.250 |
|
Bilateral Purchase |
0.315 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.05 |
48.85 |
49.34 |
4.
Average Supply Hours as advice by SLDC Gotri to Agriculture Areas.
UGVCL
|
8.27 |
Hours |
|
MGVCL |
8.30 |
Hours |
|
DGVCL |
8.00 |
Hours |
|
PGVCL |
8.00 |
Hours |
|
Average |
8.14 |
Hours |
5. Plant Load Factor and Plant
Availability Factor.
|
A |
GSEC
ENERGY FOR PLF (EXCLUDING HYDRO) |
80.580mus |
|
B |
DAILY PLF |
80.51 % |
|
C |
DAILY PAF |
92.97
% |
|
D |
CUMMULATIVE PLF |
80.20 % |
|
E |
CUMMULATIVE PAF |
81.34 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
78.02 % |
|
G |
DAILY PLF
OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
81.15 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS
IS... |
79.22 % |
6.
Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal
|
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC
(GUJ+DD+DNH) |
Bilateral |
TOTAL
GUJARAT |
|
Total Capacity |
4238 |
547 |
2725 |
* 2839 |
-186 |
9972
|
|
Capacity Available |
4238 |
547 |
2725 |
1893 |
-186 |
9403 |
|
Planned Outage |
195 |
0 |
0 |
|
|
|
|
Force Outage |
243 |
60 |
125 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
359 |
333 |
237 |
|
|
|
|
Gen. / Flow 7hrs. |
3442 |
154 |
2363 |
1861 |
-186 |
7820 |
|