Power Supply and Generation Data for 31-May-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3541 |
2995 |
2585 |
9121 |
15.00 |
|
Min. Demand catered in MW |
3376 |
2522 |
2096 |
7994 |
8.00 |
|
Energy Catered in Mus. |
82.205 |
66.042 |
55.787 |
204.034 |
|
|
Schedule Share |
Central Sector + Bilateral |
49.641 |
|||
|
|
|
|
|||
2. BILATERAL TRANSACATION DATA IN Mus:
|
Bilateral Sale |
0.0 |
|
Bilateral Purchase |
0.0 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.65 |
48.84 |
49.67 |
4. DISCOM WISE ENERGY IN Mus.
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
PGVCL |
8.793 |
12.565 |
16.208 |
13.292 |
50.858 |
|
UGVCL |
4.698 |
3.495 |
23.871 |
10.018 |
42.082 |
|
MGVCL |
3.011 |
5.901 |
2.921 |
8.322 |
20.155 |
|
DGVCL |
4.711 |
5.466 |
2.022 |
16.158 |
28.357 |
|
TOTAL |
21.213 |
27.427 |
45.022 |
47.790 |
141.452 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
79.718 MUS |
|
B |
DAILY PLF |
78.73 % |
|
C |
DAILY PAF |
87.09 % |
|
D |
CUMMULATIVE PLF |
79.91 % |
|
E |
CUMMULATIVE PAF |
81.86 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
82.22 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
79.32 % |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.42 % |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
16 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2082 |
16 |
9575 |
|
Planned Outage |
200 |
75 |
0 |
|
|
|
|
Force Outage |
120 |
60 |
125 |
|
|
|
|
Available |
90 |
0 |
218 |
|
|
|
|
Restricted Outage |
340 |
331 |
-131 |
|
|
|
|
Gen. / Flow 7hrs. |
3469 |
81 |
2515 |
2637 |
16 |
8702 |