Power Supply and Generation Data for 30-Sep-2008

 Home          Past Data         Monthly report           Trend           Unit outage

           

                       

1. Max. Demand / Energy Catered in Gujarat System.

MW   FOR

GSEC

PVT

  CEN.SEC

TOTAL

TIME

Max. Demand catered in MW

3425

2629

2511

8565

07.00

Min. Demand catered in MW    

3258

2394

2191

7843

3.00

Energy Catered  In MUs.

82.064

58.115

56.710

196.889

 

Central Sector + Bilateral

54.520

 

2. BILATERAL TRANSACATION DATA IN Mus:

Bilateral Sale   

0.000

Bilateral Purchase

4.460

 

3. FREQUENCY :

Instantaneous Maximum

Instantaneous Minimum

Average of the Day.

49.48

48.63

49.00

 

4. DISCOM WISE ENERGY IN Mus.

    DISCOM

        JGY

     URB/TWN

      AGR

        IND

      TOTAL

PGVCL

8.928

11.630

21.419

11.939

53.916

UGVCL

4.810

3.150

17.189

8.484

33.633

MGVCL

3.475

6.161

2.176

9.231

21.043

DGVCL

4.646

5.980

0.501

17.676

28.803

TOTAL 

21.859

26.921

41.285

47.330

137.395

 

5. Plant Load Factor and Plant Availability Factor.

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

 81.935 MUS

B

DAILY PLF

80.92 %

C

DAILY PAF

86.04 %

D

CUMMULATIVE PLF

72.87 %

E

CUMMULATIVE PAF

81.23 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

80.40 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS..

 81.02 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

 73.77 %

 

 6. Generation available in MW at 07.00 Hours                

GUJARAT

Thermal

Hydro

PVT+(CPP+2166 )

CEN.SEC

(GUJ+DD+DNH)

Bilateral

TOTAL

GUJARAT

Total Capacity

4219

547

2727

* 3233

311

10417

Capacity Available

4219

547

2727

2457

311

9950

Planned Outage

120

0

125

 

 

 

Force Outage

375

120

78

 

 

 

Available

0

420

0

 

 

 

Rest Outage

332

1

 133

 

 

 

Gen/Flow at 7hrs.

3392

6

2391

2918

311

8707