Power Supply and Generation Data for 07-April-2009

 

 Home          Past Data         Monthly report           Trend           Unit outage

   

1.        MAX. DEMAND / ENERGY CATERED IN GUJARAT SYSTEM

MW   FOR

GSEC

PVT

CEN.SEC.

TOTAL

TIME

Max. Demand catered in MW.             

3453

2863

2399

8715

24.00

Min. Demand catered in MW    

3646

2115

1721

7482

9.00

Energy Catered   

In MUs.

85.354

63.875

45.606

194.835

 

Central Sector + Bilateral (SCH)

42.260

      2.    BILATERAL TRANSACTION DATA IN MUs

Bilateral  Sale  

1.322

Bilateral Purchase

0.000

 

3.      FREQUENCY

Instantaneous Maximum

Instantaneous Minimum

Average of the Day

50.54

49.08

49.65

 

4.        DISCOM-WISE ENERGY IN MUs.

DISCOM

JGY

URB/TWN

AGR

IND

TOTAL

PGVCL

8.999

11.669

21.566

11.206

53.44

UGVCL

4.843

3.54

26.863

8.852

44.098

MGVCL

3.581

6.415

3.463

8.449

21.908

DGVCL

5.058

6.365

2.478

18.814

32.715

TOTAL

22.481

27.989

54.37

47.321

152.161

                                                                               

5.        PLANT LOAD FACTOR AND PLANT AVAILABILITY FACTOR

A

GSEC ENERGY FOR PLF (EXCLUDING HYDRO)

  82.15%

B

DAILY PLF

  89.11%

C

DAILY PAF

  81.4 %

D

CUMMULATIVE PLF

  80.89 %

E

CUMMULATIVE PAF

  81.33 %

F

AVAILIBILITY FACTOR AT 07.00 HOURS.

  77.63 %

G

DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS...            

  83.31 %

H

CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS…

  82.25 %

 

    6.     GENERATION AVAILABLE IN MW AT 07 Hrs

GUJARAT

Thermal

Hydro

PVT+(CPP+215 )

+ W/M

CEN.SEC(GUJ+DD+DNH)

Bilateral

TOTAL GUJARAT

Total Capacity

4219

547

2730

2805

96

 9992

Capacity Available

4219

0

2730

2805

96

 9992

Planned Outage

232

0

80

 

 

 

Force Outage

525

60

125

 

 

 

Available

  0

330

0

 

 

 

Rest Outage

187

7

-136

 

 

 

Gen/Flow at 7hrs.

3275

150

2661

1863

96

7949