Power Supply and Generation Data for 08-May-2008
1. Max. Demand / Energy Catered in Gujarat System.
|
MW FOR |
GSEC |
PVT |
CEN.SEC |
TOTAL |
TIME |
|
Max. Demand catered in MW |
3680 |
2573 |
2375 |
8628 |
15.00 |
|
Min. Demand catered in MW |
3555 |
2360 |
1988 |
7903 |
18.30 |
|
Energy Catered in Mus. |
88.434 |
58.198 |
53.147 |
199.779 |
|
|
Schedule Share |
Central Sector + Bilateral |
52.698 |
|||
|
|
|
|
|||
2. BILATERAL TRANSCATION DATA IN Mus :
|
Bilateral Sale |
0.000 |
|
Bilateral Purchase |
1.175 |
3. FREQUENCY :
|
Instantaneous Maximum |
Instantaneous Minimum |
Average of the Day. |
|
50.29 |
48.67 |
49.27 |
4. DISCOM-WISE ENERGY IN MUs
|
DISCOM |
JGY |
URB/TWN |
AGR |
IND |
TOTAL |
|
PGVCL |
8.945 |
11.901 |
17.328 |
10.759 |
48.933 |
|
UGVCL |
4.762 |
3.465 |
25.361 |
7.852 |
41.440 |
|
MGVCL |
3.156 |
5.831 |
3.307 |
7.621 |
19.915 |
|
DGVCL |
4.693 |
5.225 |
2.095 |
15.446 |
27.459 |
|
TOTAL |
21.556 |
26.422 |
48.091 |
41.678 |
137.747 |
5. Plant Load Factor and Plant Availability Factor.
|
A |
GSEC ENERGY FOR PLF (EXCLUDING HYDRO) |
86.359 Mus |
|
B |
DAILY PLF |
85.29 % |
|
C |
DAILY PAF |
89.75 % |
|
D |
CUMMULATIVE PLF |
80.18 % |
|
E |
CUMMULATIVE PAF |
81.78 % |
|
F |
AVAILIBILITY FACTOR AT 07.00 HOURS. |
86.35 % |
|
G |
DAILY PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
85.55% |
|
H |
CUMMULATIVE PLF OF GSEC UNIT WITH BACKDOWN AND AVAILABLE UNITS IS... |
80.57% |
6. Generation available in MW at 07.00 Hours
|
GUJARAT |
Thermal |
Hydro |
PVT+(CPP+2166 ) |
CEN.SEC (GUJ+DD+DNH) |
Bilateral |
TOTAL GUJARAT |
|
Total Capacity |
4219 |
547 |
2727 |
* 3001 |
68 |
10185 |
|
Capacity Available |
4219 |
547 |
2727 |
2299 |
68 |
9792 |
|
Planned Outage |
200 |
0 |
0 |
|
|
|
|
Force Outage |
120 |
60 |
250 |
|
|
|
|
Available |
0 |
0 |
0 |
|
|
|
|
Restricted Outage |
256 |
405 |
183 |
|
|
|
|
Gen. / Flow 7hrs. |
3643 |
82 |
2507 |
2194 |
68 |
8426 |
|
|
3653 |
81 |
2412 |
2169 |
16 |
8315 |